About Us :

(113MW Rongnichu Hydro Electric Project (A run of the river scheme))

Our Vision & Mission :

Mission :- MBPCL Mission is to generate clean and green power from run of the river scheme of hydro electric project.

Vision :- To contribute to the national objective of becoming self reliant in meeting energy needs from environmental benign,                   renewable source of hydro power and to promote sustainable economic and social development of all stakeholders.

Location & Infrastructure :

Location

Project:-

East District of Sikkim.

River:-

Rongnichu (Tributory of Teesta).

Barrage & Adit-0

Located at Namli Village.

Adit-1

Located at Mangthang (Nimtar) Village.

Adit-2

Located at Sumin Village.

Adit-3

Located at Samsing (Duga) Village

Surge Shaft/Valve House

Located at Zitlang Village

Power House

Located at Kumrek (Rangpo) Village

 

 

Infrastructure

i

800 Mtr long Barrage approach road at Namli.

ii

310 Mtr long approach road at Adit-1 at Mangthang, Nimtar.

iii

650 Mtr long approach road to Adit-2 at Sumin.

iv

870 Mtr long approach road to Valve house and vertical pressure shaft at Zitlang.

v

2900 Mtr long approach road to Adit-3 at Samsing Duga.

vi

1700 Mtr long approach road from Rangpo Rongli road to powerhouse at Kumrek.

vii

Explosive Magazine- 20MT capacity at Sumin.

Portable Magazine- 2no's at Samsing Duga of 0.5MT capacity each.

viii

Weigh Bridge- 50MT capacity at Rangpo.